Drainage Fund and Flood Control Project
West Baton Rouge Parish
Summary
After 8+ inches of rain fell in about a day, parish drainage held up with no reported house flooding. Work on the Loup Lane culvert and a promising drainage study continue.
At a glance
- Total mentions
- 4
- Last 30 days
- 1
Discussed at 1 meeting in the last 60 days; most recently Oct 27, 2026.
Impact analysis
Parish share would be about 10% of the project cost if the state approves the application.
Residents across the parish, especially in flood-prone areas like back of Sunset Place.
Mentions & discussions (4)
Parish Council - Oct 27, 2026
Drainage drops another half mill (collecting 5.7 of 7.2 possible) but the parish is staying aggressive on culvert projects and will fund its share of a state flood control project (Stonewall diversion) at about $375,570.
Parish Council - May 28, 2026
The parish president reported on a new canal drainage study, plans for a public outreach meeting for residents between San Francisco Street and South Intracoastal, and Union Pacific's plan to add two 36-inch culverts under the railroad near Lindale. Road and drainage crews also started work on River Road.
Parish Council - May 14, 2026
After 8+ inches of rain fell in about a day, parish drainage held up with no reported house flooding. Work on the Loup Lane culvert and a promising drainage study continue.
Parish Council - Apr 23, 2026
The parish will seek state matching funds for a diversion ditch extension through the Choctaw/South Lobdell area plus fixes for two repetitive-loss properties — the parish would pay only 10% of the cost, with four years to build if approved.
We'll email you when it's on an upcoming agenda and when it's voted on, at most once a day.
The weekly brief for West Baton Rouge Parish
What the council decided, in plain English — one email a week.
Free. Unsubscribe with one click any time. We never sell your email.