West Baton Rouge Parish · issues
Civic issues
Topics getting the most attention in West Baton Rouge Parish public meetings, ranked by how frequently they come up.
School zone turn lane project
A resident again pressed for the long-delayed left-turn lane on the east side of the high school, where cane trucks back up traffic. The project has been stuck in DOTD funding limbo for 2.5 years, though a possible state funding pot may bypass the usual process.
LA 1 / Intercoastal construction delays
A resident warned that evening traffic on LA 1 South near the Intracoastal has become dangerous because flaggers aren't timing with the Walmart light. Councilman Hotard said he contacted the sheriff and DOTD, who will issue recommendations on best practices for directing traffic.
Roads Program and 415 Connector Cost Relief
The parish may take in Phillips Lane as a parish road as part of the 415 connector corridor, and test pile driving starts before year's end — talk of a ribbon cutting has begun.
2026 Asphalt Roads Rehabilitation Project
The concrete road rehab program is wrapping up with one extra panel replacement on Commercial Drive and a small cost increase of $8,020.
Court Street sidewalk project cost overrun
A bid-quantity error on the pedestrian bridge abutments is costing taxpayers another $39,424. Council members are frustrated with repeated change orders and are pressing for better quality control before a much larger project comes up.